Centerwell Home Health
Inspection 2024-02-02
· Recertification · 6 deficiencies · CMS source report (PDF)The agency failed to ensure the plan of care was followed as ordered by the physician for 4 of 17 patients (Patient #305, #306, #310, and #314).
Show inspector's text
Loading…
The agency failed to timely provide secondary services as ordered by the physician for 5 of 17 patients (Patient #308, #309, #310, and #311).
Show inspector's text
Loading…
The agency failed to provide documentation of adequate competency training to Home Health Aides that addresses the required subject areas before providing care.
Show inspector's text
Loading…
The agency failed to document Home Health Aide (HHA) supervisory visits no less frequently than every 14 days for 3 of 4 patients receiving HHA services (Patient #308, #309, and #315).
Show inspector's text
Loading…
The agency failed to conduct the initial assessment visit within 48 hours of completing the referral for 2 of 17 patients (Patients #308 and #310).
Show inspector's text
Loading…
The agency failed to document supervision of Physical Therapy Assistants by a Physical Therapist as required for 4 of 12 sampled patients who received Physical Therapy services (Patient #301, #304, #307 and #308).
Show inspector's text
Loading…
Inspection 2021-06-21
· Recertification · 5 deficiencies · CMS source report (PDF)The agency failed to properly prevent COVID-19 through their failure to ensure staff received a fit test prior to N-95 face mask use, consistent with Washington State regulations for 4 of 26 Staff ( Staff #602, #603, #608 and Staff #609).
Show inspector's text
Loading…
The agency failed to document reference checks for 5 of 5 Home Health staff records reviewed (Staff #601, #602, #603, #604, and #605).
Show inspector's text
Loading…
The agency failed to ensure patients received a copy of their Patient Rights prior to receiving services for 7 of 13 patient records (Patients #601, #602, #605, #607, #608, #609 and #610).
Show inspector's text
Loading…
The agency failed to ensure patients received an initial assessment within 48 hours from their home health referral date for 4 of 13 patient records (Patient #605, #606, #607, and #609).
Show inspector's text
Loading…
The Agency failed to schedule professional services visits as ordered by the physician for 4 of 13 patients (Patient #603, #604, #606, and #611) including failure to schedule Speech Language Pathologist (SLP) visits, failure to schedule Physical Therapy (PT) visits, and failure to schedule…
Show inspector's text
Loading…
Inspection 2021-06-21
· Focused Infection Control, Other-Fed · 1 deficiencies · CMS source report (PDF)The agency failed to properly prevent COVID-19 through their failure to ensure staff received a fit test prior to N-95 face mask use, consistent with Washington State regulations for 4 of 26 Staff ( Staff #602, #603, #608 and Staff #609).
Show inspector's text
Loading…